Notice of Study
Funding received from CWWF a Green Infrastructure Project
East Side Water Servicing Feasibility Study Increased access to safe drinking water $117,800 Fall 2018 – Spring 2019
Link to Infrastructure Canada Web Site
All community owned buildings are operated and maintained by the Public Works Department. We maintain our roads and the road superintendent performs all repairs and snow removal. Our trucks and plows maintain private roads while outside contractors perform major repairs.
Georgina Island maintains the following roads:
A Level II Operator and an Operator in Training maintain our water treatment plant and distribution system.
A waste management officer and a gate attendant operate the landfill site. Georgina Island First Nation currently holds one refuse collection agreement with a local contractor.
Public Works – Nick Charles & John Charles
Garbage Pick Up – Rod Charles
Landfill Site – Ellie Big Canoe
Water Treatment Plant Operator – Rod Charles